ELEVATOR SHORTENING

Part of an overall project to remove a silo to redirect incoming glass producing batch, shorten an elevator, and fabricate a new head section for the elevator. Designed the project modifications.

OTHER PROJECTS FOR THIS CUSTOMER:

  • Fabricate and install new pvc dust collection lines.

  • Replace/Refurbish elevator casings.

  • Remove an elevator belt and replace busckets and reinstall the belt.

  • Emergency Service - reinstall binding steel around a furnace.

  • Install a chute that molten glass could pour out of during a furnace breakdown.

  • Fabricated and installed new bins for batch overflow.