RIGGED THIS CONTAINER TO NEW LOCATION

Moved this container from the opposite side of building to make way for new construction. It made a hard right inside to it's new location on the east side of the building.

OTHER PROJECTS FOR THIS CUSTOMER:

  • Fabricated and installed Stainless Steel Wall Liners

  • Fabricated Stainless Steel Base for Mixing Pot

  • Framed / Drywalled 2 walls and a Door

  • Numerous Stainless Steel Guards for Production Lines

  • Fabricated steel work table

  • Fabricated and installed new stairway with rails and fiberglass stair treads

  • Repaired numerous cracked floors and applied epoxy coating