RIGGED THIS CONTAINER TO NEW LOCATION
Moved this container from the opposite side of building to make way for new construction. It made a hard right inside to it's new location on the east side of the building.
OTHER PROJECTS FOR THIS CUSTOMER:
Fabricated and installed Stainless Steel Wall Liners
Fabricated Stainless Steel Base for Mixing Pot
Framed / Drywalled 2 walls and a Door
Numerous Stainless Steel Guards for Production Lines
Fabricated steel work table
Fabricated and installed new stairway with rails and fiberglass stair treads
Repaired numerous cracked floors and applied epoxy coating
|