SILO REMOVAL
Part of an overall project to redirect incoming glass producing batch, shorten an elevator, and fabricate a new head section and elevator casings. Designed the project modifications.
OTHER PROJECTS FOR THIS CUSTOMER:
Fabricate and install new pvc dust collection lines.
Replace/Refurbish elevator casings.
Remove an elevator belt and replace busckets and reinstall the belt.
Emergency Service - reinstall binding steel around a furnace.
Install a chute that molten glass could pour out of during a furnace breakdown.
Fabricated and installed new bins for batch overflow.
|
 |
 |